Project Overview

CG Medical NSW Pty Ltd was engaged to upgrade and integrate the Medical Gas Alarm Systems across three Medical Centres within the Clarence Correctional Centre. The objective was to ensure full compliance with AS2896-2021 Medical Gas Pipeline Systems, improve real-time alarm visibility, and modernise the manifold hardware and signalling infrastructure.

The works were performed by licensed medical gasfitters Clint Glasgow and Robert Glasgow, delivered in three controlled stages to maintain operational continuity within a high-security environment.

Project Scope

  • Installation of new alarm cabling through ceiling cavities and penetrations
  • Replacement of manifold arms, content gauges and pressure switches
  • Integration with the existing ASCON Master Alarm Panel
  • Programming and verification of alarm behaviours
  • Commissioning in accordance with AS2896-2021 Clause 8.2

Project Details

Client
Serco Asia Pacific
Facility
Clarence Correctional Centre
Industry
Correctional Facility
Service
Medical Gas Pipeline Systems
Completion
13 April 2026
Contractor
CG Medical NSW Pty Ltd

Three Stage Delivery

1

Stage 1 — Alarm Cabling Installation

Clause 7.4
  • Ran new alarm cable from the ASCON Master Alarm Panel to each Oxygen and Medical Air manifolds
  • Installed and protected all cabling using medium-duty UV-rated conduit
  • Ensured correct segregation from electrical infrastructure as required under AS2896-2021 Clause 7.4
  • Labelled and identified all new cables for traceability

Outcome: A compliant alarm cabling network ready for panel integration.

2

Stage 2 — Manifold Hardware Upgrade

Clause 6.5
  • Removed existing manifold arms
  • Installed new arms with upgraded contents gauges and pressure switches
  • Performed mechanical checks, leak tests and calibration verification
  • Confirmed compliance with AS2896-2021 Clause 6.5 — Manifold Requirements

Outcome: Modernised manifolds capable of accurate low cylinder pressure and reliable compliant alarm signalling.

3

Stage 3 — Alarm Connection, Programming & Commissioning

Clause 8.2
  • Connected new cabling at all manifold switches and contents gauges
  • Connected corresponding feeds at the ASCON Master Alarm Panel
  • Programmed alarm to include new inputs
  • Tested alarms for low contents, low pressure and changeover conditions
  • Verified correct annunciation, alarm priority and system reset responses
  • Completed documentation in accordance with AS2896-2021 Clause 8.2

Outcome: A fully integrated, compliant alarm system providing real-time monitoring across all three medical centres.

Standards Compliance

  • AS2896-2021 Clause 3.8 — Alarm Systems
  • AS2896-2021 Clause 6.5 — Manifold Requirements
  • AS2896-2021 Clause 7.4 — Electrical Wiring Requirements
  • AS2896-2021 Clause 8.2 — Commissioning and Verification

Project Outcomes

  • Enhanced facility safety through reliable medical gas alarm monitoring
  • Full compliance with AS2896-2021
  • Improved visibility for clinical and operational staff
  • Zero disruption to clinical operations during works